Sheet CalcB2 (Detailed Output Method)
This sheet is auxiliary and will be automatically added to your Protocol Spreadsheet if you have selected method B2 as your calculation method and have clicked on the button named "Create calcination sheet".
In the detailed output method (B2) the CalcB2 auxiliary sheet is used to correct the calcination emission factor for clinker. The auxiliary sheet thus accounts for CO2 emissions from raw material calcination for clinker production.
The other relevant components of the total CO2 emissions from raw materials are accounted for in the Plant sheet. These are:
- CO2 emissions from the calcination of bypass dust and cement kiln dust ( ) leaving the kiln system. See Plant sheet line022, line023, line024 for the input and line037 and line038a for the result.
- CO2 emissions from the organic carbon content ( ) of raw materials. See Plant sheet line008, line034s for the input and line038b for the result.
See section When to select which calcination CO2 method/sheet for information on when to select which method.